首页 产品展示>John Deere约翰迪尔强鹿柴油发动机检查、测量和安装手动燃油泵推杆

John Deere约翰迪尔强鹿柴油发动机检查、测量和安装手动燃油泵推杆

John Deere约翰迪尔强鹿柴油发动机检查、测量和安装手动燃油泵推杆供应商,John Deere约翰迪尔强鹿柴油发动机检查、测量和安装手动燃油泵推杆技术价格规格咨询服务,John Deere约翰迪尔强鹿柴油发动机检查、测量和安装手动燃油泵推杆零配件供应,John Deere约翰迪尔强鹿柴油发动机检查、测量和安装手动燃油泵推杆售后服务中心,John Deere约翰迪尔强鹿柴油发动机检查、测量和安装手动燃油泵推杆,John Deere约翰迪尔强鹿柴油发动机检查、测量和安装手动燃油泵推杆详细的技术参数,
产品咨询

详细描述

John Deere约翰迪尔强鹿柴油发动机检查、测量和安装手动燃油泵推杆

1. Remove and clean push rod (A). Label end(s) forreassembly in same orientation.

A—Push Rod

2. Measure push rod OD (B). If OD is less thanspecification, install a new push rod.

Specification

Fuel Supply Pump Push Rod—OD 9.891—9.917 mm(0.3894—0.3904 in.)

B—Push Rod OD

3. Check crown on push rod ends. If flat or concave,replace push rod and check camshaft lobe for wear.(See MEASURE CAMSHAFT LOBE HEIGHT in Group050.)

4. Measure push rod bore ID (C) in block.

Specification

Fuel Supply Pump Push RodBore in Block—ID 10.00—10.05 mm(0.3937—0.3957 in.)

Repair or replace block as necessary.

5. Lubricate push rod with clean engine oil and install inbore with same end orientation as removed.

C—Bore ID

免费热线
400-082-9096 
整机销售
0731-84424871  18374999699
售后维修
0731-84424872  15580888444
配件销售
0731-84424873  18274802060
手机端
微信公众号